Western Railway to Install 'Kavach' Safety System on Mumbai's Virar-Churchgate Route

Cities
N
News18•09-01-2026, 12:59
Western Railway to Install 'Kavach' Safety System on Mumbai's Virar-Churchgate Route
- •Western Railway plans to install the advanced 'Kavach' safety system on the 60-kilometer Virar to Churchgate route in Mumbai.
- •The survey for building towers is complete, with 50% of tower construction done and soil testing finished at 14 of 15 locations.
- •Kavach is an indigenous Automatic Train Protection (ATP) system designed to prevent collisions, over-speeding, and signal violations.
- •It automatically applies brakes if a driver misses a signal, goes too fast, or if trains are dangerously close, ensuring safety.
- •The system uses radio communication, RFID tags, and onboard computers, and is certified at Safety Integrity Level 4 (SIL-4).
Why It Matters: Western Railway is enhancing safety on the Virar-Churchgate route with the advanced 'Kavach' system.
✦
More like this
Loading more articles...





