Loading...
61 KM Najafgarh Drain Highway Corridor Work Begins This May
LIVE TV
LOCAL
Tour
ENGLISH
For You
Entertainment
National
Sports
Markets
Business & Economy
Lifestyle
World
Astrology & Religion
Technology
Education & Jobs
Auto
Politics
Viral
Opinions
Loading more articles...
Home
Local
Live TV
Najafgarh Drain Highway: 61 KM Corridor Work Begins May 2026, Delhi-Gurugram Travel Boost
N
News18
•
24-02-2026, 21:02
Najafgarh Drain Highway: 61 KM Corridor Work Begins May 2026, Delhi-Gurugram Travel Boost
•
Work on the 61 KM Najafgarh Drain Corridor, costing 454 crore rupees, to begin in May 2026.
•
Project aims to connect Dwarka, Najafgarh, and Uttam Nagar to Outer Ring Road and Delhi Airport.
•
Expected to be completed by November 2027, significantly reducing travel time between Delhi and Gurugram.
•
Features a 7-meter wide paved road, separate tracks for pedestrians/cyclists, and a new bridge near Dwarka Metro Yard.
•
Led by Chief Minister Rekha Gupta, the project will enhance connectivity and reduce traffic congestion and pollution.
Read Full Article on News18 in Hindi
✦
More like this
✦
More like this
Gurugram's New Elevated Road: Delhi, Dwarka Minutes Away, Traffic Jams End
N
News18
Worli Naka traffic relief: BMC builds 2 new bridges, cuts 15-min detour by 2027
N
News18
Delhi-Dehradun Expressway Trials Begin: Travel Time Halved, Wildlife Corridor a Highlight
N
News18
Delhi to Build 61 KM Road Along Najafgarh Drain: Boosts Connectivity, Cuts Congestion
N
News18
North Delhi's Rajpur Road: Traffic Curbs Till March 25 For Sewer Line Work
N
News18
Delhi to get 2 new expressways after Holi: Save time, money on NCR travel
N
News18